Abstract

Uplift is one of the major forces acting on concrete dams and is inherently difficult to predict. In dam safety guidelines, uplift is typically evaluated deterministically, assuming simplified pressure distributions along the concrete–rock interface. For buttress dams, the concrete–rock contact area is smaller than that of gravity dams, but in the presence of persistent fracture planes in the rock foundation, the effective area over which uplift can act can be substantially larger. Due to the low self-weight of buttress dams, this poses a significant safety concern, as sliding stability has been shown to be sensitive to variations in uplift. To address these safety concerns, pore pressure monitoring with alarm thresholds and predefined countermeasures has been proposed in dam safety guidelines. However, there is limited guidance on how such alarm thresholds should be defined or implemented in practice. In this paper, we introduce a reliability-based framework in which alarm thresholds are derived from target probabilities of failure. The methodology is demonstrated for a concrete buttress monolith with characteristics similar to those of an existing dam in northern Sweden, where the probability of sliding failure is evaluated with uplift pressure represented by a random variable. The proposed framework enables the upper tail of the pore pressure distribution to be truncated at the alarm threshold, allowing stability requirements to be satisfied in re-evaluations of existing dams without structural measures while maintaining the required level of safety. Practical considerations when defining alarm thresholds are discussed, including how exceedance of an alarm threshold may reflect long-term changes in hydraulic behaviour caused by deterioration processes in the rock foundation and how to provide sufficient lead time for pre-defined countermeasures.

Contributors

Authors

  1. Johanna Dyberg Thonée KTH Royal Institute of Technology, Stockholm, Sweden ORCID 0009-0000-7988-2939
  2. Maryam Zamzami KTH Royal Institute of Technology, Stockholm, Sweden ORCID 0009-0003-9547-6529
  3. Johan Spross KTH Royal Institute of Technology, Stockholm, Sweden ORCID 0000-0001-5372-7519
  4. Marie Westberg Wilde KTH Royal Institute of Technology, Stockholm, Sweden; AFRY, Solna, Sweden ORCID 0000-0003-2584-1183
  5. Fredrik Johansson KTH Royal Institute of Technology, Stockholm, Sweden ORCID 0000-0002-8152-6092

Index terms

Keywords

Full text

Attachments

Works cited

References

  1. da Silva, J. F. (2015) Clogging of drains and its influence on the stability of concrete dams. Proceedings of the ARMA US Rock Mechanics/Geomechanics Symposium:ARMA-2015-140.
  2. Dunnicliff, J.(1993). Geotechnical instrumentation for monitoring field performance: John Wiley & Sons.
  3. Farinha, F., E. Portela, C. Domingues, and L. Sousa (2005) Knowledge-based systems in civil engineering: Three case studies. Advances in engineering software 36 (11-12):729-39.
  4. FERC (Federal Energy Regulatory Commission) (2016a) Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter III Gravity Dams, Washington, DC
  5. FERC (Federal Energy Regulatory Commission) (2016b) Risk-informed decision making (RIDM)-risk guidelines for dam safety (Interim Guidance).
  6. Goodman, R. E., B. Amadei, and N. Sitar (1983) Uplift pressure in crack below dam. Journal of energy engineering 109 (4):207-21.
  7. Hanna, A. W. , H. D. Plewes, R. Wong, and W. C. Seyers (1993) Investigations of high uplift pressures beneath a concrete dam. Canadian Geotechnical Journal 30 (6):974-90.
  8. Hu, J., and F. Ma (2016) Comprehensive investigation method for sudden increases of uplift pressures beneath gravity dams: Case study. Journal of Performance of Constructed Facilities 30 (5):04016023.
  9. ICOLD (International Commission on Large Dams) (2000) Automated dam monitoring systems: Guidelines and cae histories, Bulletin 118 Paris, France
  10. Johansson, F., A. Krounis, and M. Westberg Wilde (2017) Igensättning av dränage under betongdammar–Orsaker, övervakning och åtgärder: Energiforskrapport 2017: 369.
  11. Pate-Cornell, M. E., and C. P. Benito-Claudio (1987) Warning systems: Response models and optimization. Uncertainty in risk assessment, risk management, and decision making:457-68.
  12. Pereira, R., A. L. Batista, L. C. Neves, and J. M. Casaca (2021) A priori uplift pressure model for concrete dam foundations based on piezometric monitoring data. Structure and Infrastructure Engineering 17 (11):1523-34.
  13. Ruggeri, G. (2004) Working Group on Uplift Pressures under Concrete Dams, Final Report. ICOLD (International Commission on Large Dams), Italy
  14. Spross, J., and F. Johansson (2017) When is the observational method in geotechnical engineering favourable? Structural safety 66:17-26.
  15. Spross, J., F. Johansson, and S. Larsson (2014) On the use of pore pressure measurements in safety reassessments of concrete dams founded on rock. Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards 8 (2):117-28.
  16. Spross, J., F. Johansson, L. K. T. Uotinen, and J. Y. Rafi (2016) Using observational method to manage safety aspects of remedial grouting of concrete dam foundations. Geotechnical and Geological Engineering 34 (5):1613-30.
  17. Swedenergy (2020) Betongdammar [Concrete dams]. Energiföretagens riktlinjer för dammsäkerhet (RIDAS) [Swedish Hydropower Companies' Guidlines for Dam Safety]. Swedenergy, Stockholm
  18. Westberg Wilde, M., and F. Johansson (2016) Probabilistic model code for concrete dams. Energiforsk AB, Stockholm, Sweden
  19. Yu, Y., and Y. X. Zhang (2017) Coupling of chemical kinetics and thermodynamics for simulations of leaching of cement paste in ammonium nitrate solution. Cement and Concrete Research 95:95-107.
  20. Yue, J., Z. Shen, L. Xu, and K. Zhang (2022) Numerical analysis the calcium leaching effect in concrete and concrete-rock interface on concrete gravity dam anti-sliding stability. Case studies in construction materials 17:e01158.
  21. Zhang, K., L. Xu, L. Qiu, J. Tan, C. Yang, and K. Zhang (2021) Numerical analysis of concrete gravity dam seepage characteristics evolution considering the calcium leaching effect. Advances in Civil Engineering 2021 (1):9042863.