Summary
Abstract
When attempting to understand rock mass behaviour, we often assume our process is straightforward: collect data, make observations, and synthesize an interpretation. But this assumes we approach the rock mass without preconceptions. In reality, unless we have some a priori framework for what we expect to find, how do we decide which observations matter and which data to collect? This captures an important epistemological insight: observation is never theory-neutral. We always bring conceptual frameworks that guide what we look for and how we interpret what we find. Rock bridges exemplify this problem perfectly. Current practice, particularly Jennings's method based on rock bridge percentage, continues to assume we can measure rock bridge strength pre-failure based on a post-failure interpretation imposed on a pre-failure reality we cannot observe. However, only once a rock mass has failed is it possible, in principle, to define and measure the rock bridges that resisted failure in the first place. Before failure, their location and geometrical nature can only be described probabilistically. This creates the principle of rock bridge uncertainty: once a rock bridge has been identified and its "size" has been determined, the rock mass has already undergone failure. But engineers need to characterize rock bridges before failure occurs. From an engineering design perspective, it is precisely when rock bridges cannot be observed and measured that we claim to quantify their strength. This paradox necessitates abandoning deterministic rock bridge percentage methods in favour of stochastic approaches. We propose a probabilistic framework that can help characterize potential failure mechanisms beyond the classical problem of rock bridge failure and the associated “equivalent discontinuity”. The implications extend beyond technical methodology to engineering practice: by embracing uncertainty rather than ignoring it, we can make better-informed decisions about slope stability, excavation design, and risk management in fractured rock masses
Index terms
Keywords
Full text
Attachments
Works cited
References
- Beingessner T (2026) Slope damage and acceleration of slope failures. MASc Thesis. University of British Columbia.
- Bewick RP, Elmo D (2025) Size Effect and Rock Mass Strength. Canadian Geotechnical Journal. 62: 1-18. https://doi.org/10.1139/cgj-2024-0531.
- Elmo D (2023) The Bologna interpretation of rock bridges. Geosciences, Vol. 13(2), 33 https://doi.org/10.3390/geosciences13020033.
- Fukuzono T (1985)A method to predict the time of slope failure caused by rainfall using the inverse number of velocity of surface displacement. Journal of the Japan Landslide Society (Landslides), 22(2), 8–13.
- Jennings, JE (1970) A mathematical theory for the calculation of the stability of slopes in open cast mines. In Planning Open Pit Mines,Proceedings, Johannesburg; Van Rensburg, P.W.J., Ed.; A.A. Balkema: Cape Town, South Africa, 1970; pp. 87–102.
- Jennings, JE (1971) An approach to the stability of rock slopes based on the theory of limiting equilibrium with a material exhibiting anisotropic shear strength. Stability of rock slopes. In Proceedings of the 13th US Symposium on Rock Mechanics, Urbana, IL, USA, 30 August–1 September 1971.
- Rose ND, Hungr O (2007) Forecasting potential rock slope failure in open pit mines using the inverse-velocity method,International Journal of Rock Mechanics and Mining Sciences,Volume 44, Issue 2,Pages 308-320,https://doi.org/10.1016/j.ijrmms.2006.07.014.