Risk assessments for examining problematic geotechnical aspects of major projects have become increasingly popular over the last several decades. Trends in international tunnel contracts to require Risk Registers and Geotechnical Baseline Reports has spurred much of this interest. Environmental risks and public perception issues have driven development in the Mining industry, but still there remains a challenge assessing geotechnical risk. While quantitative assessment has become more sophisticated, inevitably synthesis is needed, still demonstrating credibility. Simplification, based on well-reasoned argument, is required for decision making, but still with quantitative back-up. AI has potential to facilitate simplification advances, by handling ever-increasing volumes of data. In the right circumstances AI will help more informed assessment, but can be completely misleading if used incorrectly. Classically, even the most complex QRA’s have needed to be boiled down to plot on a 5x5 “likelihood versus consequence” matrix. Mostly these are formulated with rankings for financial, project, operational or fatality risk. Incorporating geotechnical ground condition risk is often complex. The recently introduced 3D 5x5x5 matrix diagram, initially developed for open pit closure (Hawley et al., 2024, Carter et al., 2022) paves the way for a different approach for ranking geotechnical risk in an equal way as other drivers. In the 3D 5x5 matrix, one axis is ground condition risk, which can be stability PoF/FoS for infrastructure components (foundations, tunnel linings etc.,) or mechanisms (hydrofracture, overstress) or any other aspect of geotechnical significance. This scale partly addresses likelihood, along with the design confidence axis, which addresses design uncertainty, as well as data sparsity/imprecision, so together on one side of the block diagram give insight in a classic 5x5 matrix format. This paper presents the methodology and approaches for utilizing the 3D diagram to improve understanding and allow better decision-making when undertaking risk assessments for any geotechnically impacted project.

Contributors

Authors

  1. Justin Dixon Fortesque Pty, Australia
  2. Trevor G. Carter TGC-Geo-Solutions, Canada ORCID 0000-0001-6746-959X
  3. Phil J.H. deGraaf Giraffe Mining Pty, Australia
  4. Hazim Abu-Taleb Fortesque Pty, Australia

Index terms

Keywords

Full text

Attachments

Works cited

References

  1. Bao, C., Li, J., Wu, D. (2022). Three-Dimensional Risk Matrix: Theoretical Basis and Construction. In: Risk Matrix. Innovation in Risk Analysis. Springer, Singapore. https://doi.org/10.1007/978-981-19-1480-5_8
  2. Carter T.G. (1992). Prediction and Uncertainties in Geological Engineering andRock Mass Characterization Assessment. In: Proceedings of the 4th Italian RockMechanics Conference, Torino, pp 1.1–1.22
  3. Carter, T.G.: (2018) Suggested standards for improving structural geological definition for open pit slope design. In: Proceedings of Slope Stability 2018, Sevilla, Paper #102, 26 pp.
  4. Carter, T.G., de Graaf, P.J.H.; Dixon, J.; Creighton, A.; Macciotta, R.; Silva-Tulla, F. and Stacey, P. (2022). Transitioning from Mine Operations to Closure – the Dilemma of differing geotechnical Design Acceptance Criteria perspectives, Proc. 15th Int. Conf. on Mine Closure, Oct. 2022, Brisbane, Australia.
  5. Cram, Robert S. (2000) 3D Model for Qualitative Risk Assessment. Paper presented at the SPE International Conference on Health, Safety, and Environment in Oil and Gas Exploration and Production, Calgary, Alberta, Canada, March 2000
  6. de Graaf, P. J. H., Beale, G., & Carter, T.G., (Eds.). (2025). Guidelines for Open Pit and Waste Dump Closure. CSIRO Publishing, 400pp
  7. Global Tailings Review. (2020). Global industry standard on tailings management. United Nations Environment Programme. https://globaltailingsreview.org/global-industry-standard/
  8. Hawley, M., Carter, T. G., Dixon, J., & de Graaf, P. J. H. (2024). Risk based design targets for closure of waste rock dumps. Paper presented at the International Symposium on Slope Stability 2024, Brazilian Mining Association, Brazil
  9. Macciotta R, Creighton A, Martin CD (2022) Reliability Based Design Acceptance Criteria for inter-ramp and overall pit slopes—fundamental considerations and mathematical background. In: Slope 2022, proceedings of the slope stability conference in civil and mining 2022, Tucson, AZ, US October 17–20.
  10. Miller, K (2019), ‘Constructing a legally sound demonstration of ALARP’, Proceedings of Hazards 29, Symposium Series No. 166,Institution of Chemical Engineers, Birmingham.
  11. Watson, C. C. (2004). Risk assessment using the three dimensions of probability (likelihood), severity, and level of control. Proceedings of the 22nd International System Safety Conference. International System Safety Society.